References / Lovochemie

Lovochemie

Project: Boiler K9 – increasing of backup steam power – a study elaboration of the electrical and M&C part
Location: Lovochemie, Czech Republic
Year of termination: 2017
Customer: CENTROPROJEKT GROUP a.s.
Brief description of the contract: increasing of backup power by 50 t/hour of steam from the natural gas by means of a new energy source, or by redesigning of existing backup boilers in such a way so that the backup power achieves 100 t/hour of steam for the electrical and M&C part.